The Pioneer
Dams have much strategic value
Friday, 20 June 2014
|
The idea
of leaving a better planet for the next generation is adorable, but not at the
cost of wiping out the present generation
As per
media reports, the Union Government has eased green norms for building
strategically important infrastructure projects along India's border with
China. This decision will give a major boost to the construction of a number of
border road projects etc that have been awaiting environmental clearances for
long.
While
China has built roads and airports along the Line of Actual Control, to
provide uninterrupted logistical support to its troops, India is
struggling to cope up with the pace of construction in the border areas due to
objections mainly from the environmental lobby. Surprisingly, the Siang high
dam project (Brahmaputra), and the Khab project (Sutlej) planned to contain the
disastrous floods from the Tibetan rivers, do not find a place in this list of
projects.
The need
for considering dams built on trans-boundary rivers as strategically important
structures, arises due to the fact that China is presently on a dam-building
spree to meet its increasing water and energy needs. India cannot afford to
ignore the security threats associated with dam failures in the Tibet region, a
reason adequate to justify inclusion of our dam projects in the list. We had
already experienced in August 2000 such a situation created by the Tibetan
rivers both in Himachal Pradesh and Haryana due to Sutlej floods, and in
Arunachal Pradesh and Assam due to a flooded Brahmaputra, for want of flood
control dams downstream of these rivers in India.
China is
reportedly planning a cascade of five dams across the Yarlung Tsangpo
(Brahmaputra) for power generation. Another major project, the Shuomatan
project (the Great Bend Project), near the border, is also being planned to
divert annually 17 billion cubic metres of the Brahmaputra waters in the
ultimate stage, to northern China.
India has
no right to object to the construction of water resource projects by China
within the latter’s territory, as there are no river water sharing agreements between
the two countries, except for an ‘understanding' for exchange of river flow
data. Though China has assured us that these are not storage projects and,
hence, will not affect the river flows downstream in India, we have to be
concerned since the Chinese interventions in these rivers could affect our
projects and habitats.
The
existing ‘understanding’ is not adequate to take care of such Indian concerns.
Hence construction of dam projects in India is an urgent necessity. We
cannot just depend on the assurances of our neighbour. Once strategic
importance is given to these projects, approvals will come through fast and
implementation will be better. The projects will not languish, awaiting
environmental and other clearances, as is happening now.
In this
connection, the experience of Vietnam, Laos, Cambodia and Thailand, the
co-basin states in the Mekong basin, due to upstream Chinese hydro-projects,
should be an eye opener for India. Though these states protested against
China’s indiscriminate upstream reservoir operations which upset their
agriculture and other activities, and sudden gate openings which resulted in
floods and devastation downstream, China did not bother about the objections
raised by these states and even of the Mekong River Commission, stating that it
is not a member of the Commission.
Likewise,
India could also be at the receiving end. Chinese reservoir operations for
hydro-power generation or for water diversions, would cause high river water
level fluctuations downstream necessitating closure of our existing
hydro-projects during that period. Also when they release heavy flood flows by
opening all the gates of their dam structures, vast areas downstream in India
would be devastated. Unfortunately, we have no large reservoirs downstream that
reach the international rivers like Brahmaputra, to absorb the water level
fluctuations and to contain the floods from upstream so as to protect our
projects and habitats.
Though
Indian experts had prepared detailed project plans for major dams on these
rivers with adequate flood storage provisions, due to the insistence of the
environmental lobby that the dam projects should be dropped to keep the river
reaches free to ensure the river ecology and biodiversity all the way
down, the Government is going slow even in clearing these projects for
implementation.
Considering
the strategic importance of these projects, the Siang high dam project
(Brahmaputra) and the Khab hydro project (Sutlej) should also be treated as
strategically important projects for fast-track clearance and expeditious
implementation instead of the authorities labouring under an ideology
induced myopia.
The lofty
ideal of leaving a better planet for the future generation is certainly
adorable, but not at the cost of wiping out the present generation through
devastating floods and sufferings.
No comments: